26 SEPTEMBER 2014
Sunday, 12 October 201412.10.14
Holaa. So, lets gather at 6.30 am. Bell, Zawatie and I
walked together to the venue. Then we met Aishah. She said there was no one
else there. As we reached there, yes, we’re the early one (bell woke up so
early) . Hahah. We waited for our friends. Some of our friends came very late.
So that’s why Aishah burst to the maximum. So, after that, we started our day
with warming up session and star jump. Then we recite asma ul husna. Not to
forget our planters song. Afterward, we
need to bring the equipment to the share farm. Yayyyyy. For today, we need to
prepare the beds for our plants. The time taken for us to do the clearance process was 9 hours 15 minutes. I thought it won’t take a long time to finish
up. But it was totally wrong. We’re taking so long to finish up. We could not
do the beds as we pleased. We were given the measurement for each bed. The first
step should be measured the area. Luckily the measurement was made yesterday. Then the area supposed be marked and the lining should be done. The total measurement should be:
60x85 fts (whole area)
4x12 fts (each bed)
3 fts for agro road ( vertical and horizontal)
2 fts from drain
1 fts from others bed
the lining master :)
oyeahhh
Before i forgot, we need to make drain around the beds area.
After that, we could continue with the preparing beds. So, together we join hands to reach
our goals ( school song). Hahaha.
in the making of beds
But then, we couldn’t make it. Luckily, we
were given 2 weeks to finish the beds. So, we continued next Friday .